Building site selected! Sign posted!
|

South-east corner view.
|

Vegetation clearing.
|

Grubbing the site.
|

South-west view.
|

Easterly view.
|

Westerly view.
|

Northerly view.
|

More grubbing.
|

Easterly view.
|

Easterly view with sod removed.
|

Hauling away sod.
|

Proof rolling.
|

Hauling in structural fill.
|

More structural fill.
|

Site prep.
|

Structural fill.
|

Fine tuning.
|

Majestic Mt. Rainier view.
|

Easterly view.
|

Northerly view.
|

Construction entrance.
|

Geo-fabric being placed.
|

Fill being placed.
|

Southerly view.
|

Production.
|

Structural fill.
|

Vegetation removed.
|

Vegetation removed.
|

Belly dump gravel truck.
|

Southerly view.
|

Southerly view.
|

Side dump gravel truck.
|

Westerly view.
|

Progress.
|

Storm water components.
|

Catch basin.
|

Easterly view.
|

Sanitary sewer pipe.
|

Sanitary sewage pipe installation.
|

Retention pond re-design.
|

Manhole preparation.
|

Manhole installed.
|

Oil water separator.
|

Underground conveyance.
|

Oil water separator installation.
|

Retention pond channel.
|

Improved site!
|

Water main installation.
|
|
|

Placing structural fill.
|

Placing crushed rock prior to ATB installation.
|

Oil / Water seperator.
|

Looking at the northwest corner of what will eventually be the building.
|

Domestic water line.
|

Electrical conduit.
|

Storm water inlet.
|

ATB placement.
|

More ATB.
|
|
|

Looking south.
|
|
|
|

Finishing ATB.
|

Installing temporary fence.
|

Snow!
|
|
|
|

Batter boards.
|

Start of plumbing.
|

Installing rain leader.
|

Excavation for foundation.
|

Start of fire sprinkler installation.
|
|

Plumbing drain pipe.
|

Forms for building footing.
|
|

More forms for building footing.
|
|

More snow!
|

Concrete pumper.
|
|

Finish work on concrete.
|
|

Concrete curing with blanket.
|

Forming of foundation walls.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|